
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
955		1		113
949		2		122
942		3		128
936		5		141
929		6		156
922		7		166
917		8		171
916		9		176
915		10		181
909		11		186
906		12		189
903		13		209
902		14		213
897		16		221
896		17		224
890		17		228
889		18		232
884		19		237
883		20		240
880		21		250
878		22		255
877		23		258
871		24		277
870		25		281
867		25		297
866		26		305
865		27		307
864		28		309
860		29		312
858		29		320
857		30		323
850		31		326
846		33		336
845		34		346
837		35		349
835		35		352
834		36		355
832		37		357
829		38		360
826		39		362
825		40		364

Optimization completed
----------------------
number of nodes     : 29
number of edges     : 86
number of demands   : 812
first solution time : 3
optimization time   : 180887
initial max maxLinkLoad    : 968
final max maxLinkLoad      : 825
number of tunnels   : 40
pre-optimization max link utilization 0.9684068730927535
post-optimization max link utilization 0.8253932357478262
4 demands over 812 (0.49261083743842365%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.914145267
