
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
958		1		75
945		2		84
935		3		91
932		4		96
921		5		101
919		6		105
912		7		110
908		8		115
907		9		119
905		10		124
901		11		127
898		12		130
893		13		133
891		14		137
886		15		141
885		15		145
880		16		148
879		17		150
878		18		152
871		19		155
870		20		157
867		21		159
865		22		162
862		24		169
858		24		174
852		25		177
851		26		179
848		27		181
846		26		183
845		27		186
842		28		191
838		29		195
833		30		198
831		31		200
828		32		203
826		33		206

Optimization completed
----------------------
number of nodes     : 29
number of edges     : 86
number of demands   : 812
first solution time : 3
optimization time   : 180100
initial max maxLinkLoad    : 972
final max maxLinkLoad      : 826
number of tunnels   : 33
pre-optimization max link utilization 0.972525602460145
post-optimization max link utilization 0.8268030248173912
2 demands over 812 (0.24630541871921183%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.120511903
