
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
931		1		77
925		2		86
924		3		92
912		4		97
911		5		100
907		6		104
904		7		113
899		7		117
897		8		121
893		9		124
891		10		126
890		11		129
884		12		132
880		14		138
879		13		140
877		14		142
875		15		145
870		16		148
866		17		152
864		18		158
862		20		163
859		21		165
853		22		168
850		23		171
847		24		174
845		25		178
839		26		183
837		27		186
834		28		188
833		29		191
830		30		193
823		32		198
821		33		200
819		34		202
817		35		204
813		36		207
812		37		209

Optimization completed
----------------------
number of nodes     : 29
number of edges     : 86
number of demands   : 812
first solution time : 3
optimization time   : 180729
initial max maxLinkLoad    : 944
final max maxLinkLoad      : 812
number of tunnels   : 37
pre-optimization max link utilization 0.9451711198833334
post-optimization max link utilization 0.8132690834347825
2 demands over 812 (0.24630541871921183%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.747055859
