
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
954		1		101
942		3		125
935		4		132
934		5		140
931		6		147
928		7		151
922		8		154
921		9		159
917		10		162
915		11		166
908		12		169
906		14		178
899		15		181
896		16		185
894		17		190
892		18		196
883		19		201
882		20		203
881		21		206
880		22		211
875		23		217
873		24		220
871		25		226
864		26		234
861		27		236
859		28		238
858		29		241
854		30		244
848		31		246
845		32		249
843		32		254
838		33		267
837		35		278

Optimization completed
----------------------
number of nodes     : 29
number of edges     : 86
number of demands   : 812
first solution time : 3
optimization time   : 180670
initial max maxLinkLoad    : 968
final max maxLinkLoad      : 837
number of tunnels   : 35
pre-optimization max link utilization 0.968645491571739
post-optimization max link utilization 0.8373981772608695
2 demands over 812 (0.24630541871921183%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.696473826
