
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
990		1		82
983		2		96
971		3		101
957		4		110
951		5		119
947		6		125
940		7		131
938		8		135
937		9		141
927		10		144
924		11		147
923		12		152
921		14		160
919		15		164
918		16		165
913		17		168
911		18		169
910		19		175
905		20		177
904		22		181
901		22		184
892		23		187
890		24		195
879		26		201
878		27		203
875		28		205
872		29		208
871		30		210
866		31		212
865		32		214
859		33		217
858		34		219
854		36		223
846		37		225
845		38		227
841		40		230
840		41		232
838		42		234
836		43		237
831		44		238
829		45		240
826		46		242
824		47		244

Optimization completed
----------------------
number of nodes     : 29
number of edges     : 86
number of demands   : 812
first solution time : 3
optimization time   : 180243
initial max maxLinkLoad    : 993
final max maxLinkLoad      : 824
number of tunnels   : 48
pre-optimization max link utilization 0.9938890547920289
post-optimization max link utilization 0.8248360180173911
5 demands over 812 (0.6157635467980296%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.273287845
