
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
942		1		86
935		2		98
928		3		106
923		4		115
916		5		122
915		6		129
912		7		136
906		8		140
903		9		144
902		10		150
896		11		154
895		12		159
892		13		162
889		15		168
886		16		171
883		18		177
880		19		181
878		20		184
873		20		187
871		21		190
870		22		193
868		23		196
867		24		200
861		25		203
857		26		206
856		27		210
855		28		215
847		29		218
844		30		222
842		31		226
837		32		230
835		33		234
834		34		236
830		35		238

Optimization completed
----------------------
number of nodes     : 29
number of edges     : 86
number of demands   : 812
first solution time : 3
optimization time   : 180928
initial max maxLinkLoad    : 955
final max maxLinkLoad      : 830
number of tunnels   : 35
pre-optimization max link utilization 0.9559295057268116
post-optimization max link utilization 0.8312828866434779
2 demands over 812 (0.24630541871921183%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.957458622
