
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
957		1		98
943		2		109
940		3		124
935		4		134
930		4		154
927		5		161
921		6		174
915		7		181
913		8		186
910		9		190
907		10		194
904		12		201
901		12		206
896		13		210
893		14		213
890		15		218
888		16		223
881		17		228
880		18		237
877		19		241
876		20		246
868		21		257
866		22		263
863		23		273
861		24		276
855		25		280
854		26		282
853		27		285
848		28		289
846		29		291
843		30		293
842		31		295
837		32		297

Optimization completed
----------------------
number of nodes     : 29
number of edges     : 86
number of demands   : 812
first solution time : 3
optimization time   : 180702
initial max maxLinkLoad    : 964
final max maxLinkLoad      : 837
number of tunnels   : 32
pre-optimization max link utilization 0.9646039446086957
post-optimization max link utilization 0.8373591691217391
1 demands over 812 (0.12315270935960591%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.728327191
