
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1345		1		100
1332		2		111
1325		3		118
1315		4		124
1311		5		131
1302		6		136
1297		7		142
1289		8		145
1285		9		148
1278		10		150
1276		11		153
1271		12		155
1269		14		159
1265		15		163
1262		16		166
1251		17		172
1249		18		174
1242		19		178
1238		20		180
1235		21		182
1225		22		184
1221		23		188
1214		24		197
1212		25		202
1201		26		204
1198		27		208
1192		28		211
1188		29		213
1179		30		215
1174		31		218
1173		33		3307
1172		34		10358
1167		35		10361
1166		35		16418
1160		34		106771

Optimization completed
----------------------
number of nodes     : 29
number of edges     : 82
number of demands   : 812
first solution time : 4
optimization time   : 180104
initial max maxLinkLoad    : 1358
final max maxLinkLoad      : 1160
number of tunnels   : 34
pre-optimization max link utilization 1.3593159024608699
post-optimization max link utilization 1.160885632131884
2 demands over 812 (0.24630541871921183%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.12947351
