
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1096		1		82
1083		2		94
1079		3		101
1075		4		106
1065		5		113
1062		6		124
1061		9		259
1060		11		1898

Optimization completed
----------------------
number of nodes     : 29
number of edges     : 82
number of demands   : 812
first solution time : 2
optimization time   : 180544
initial max maxLinkLoad    : 1109
final max maxLinkLoad      : 1060
number of tunnels   : 11
pre-optimization max link utilization 1.1098942114485508
post-optimization max link utilization 1.0613277754217392
1 demands over 812 (0.12315270935960591%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.566423413
