
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1094		1		112
1091		2		123
1087		3		133
1078		4		142
1077		6		1568
1076		9		3286

Optimization completed
----------------------
number of nodes     : 29
number of edges     : 82
number of demands   : 812
first solution time : 4
optimization time   : 180432
initial max maxLinkLoad    : 1107
final max maxLinkLoad      : 1076
number of tunnels   : 13
pre-optimization max link utilization 1.1081539297608696
post-optimization max link utilization 1.0770491275521739
1 demands over 812 (0.12315270935960591%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.460633247
