
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1060		1		98
1051		2		106
1046		3		116
1034		4		123
1027		5		128
1016		6		132
1007		7		137
999		8		145
998		9		149
980		10		152
978		11		157
963		12		160
961		13		166
949		14		169
941		15		180
939		16		182
924		17		186
920		18		188
906		19		201
902		20		203
886		21		205
884		22		207
882		23		209
869		24		211
865		25		213
856		26		216
851		27		221
838		28		224
832		29		245
818		30		265
813		31		267
801		32		269
795		33		283
786		34		285
782		35		287
769		36		288
768		37		290
765		38		292

Optimization completed
----------------------
number of nodes     : 19
number of edges     : 48
number of demands   : 342
first solution time : 3
optimization time   : 180158
initial max maxLinkLoad    : 1071
final max maxLinkLoad      : 765
number of tunnels   : 38
pre-optimization max link utilization 1.0715174136609378
post-optimization max link utilization 0.7659865026
6 demands over 342 (1.7543859649122806%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.172810197
