
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1052		1		87
1046		2		99
1039		3		106
1028		4		110
1020		5		114
1010		6		121
1001		7		125
990		8		130
981		9		133
976		10		136
962		11		139
956		12		142
943		13		146
936		14		149
923		15		151
917		16		157
903		17		160
899		18		161
894		19		164
880		20		166
879		21		168
870		22		170
862		23		171
860		24		173
843		25		174
841		26		175
829		27		177
824		28		178
809		30		180
805		31		181
800		32		182
792		33		183
782		34		184
775		35		185
773		36		186
764		37		187
762		38		188
748		39		190

Optimization completed
----------------------
number of nodes     : 19
number of edges     : 48
number of demands   : 342
first solution time : 3
optimization time   : 180631
initial max maxLinkLoad    : 1065
final max maxLinkLoad      : 748
number of tunnels   : 39
pre-optimization max link utilization 1.0654147147265622
post-optimization max link utilization 0.7483597143499999
5 demands over 342 (1.4619883040935673%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.64950903
