
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1053		1		100
1040		2		111
1033		3		116
1027		4		121
1019		5		123
1018		6		129
1009		7		133
1004		8		142
990		9		146
986		10		150
970		11		153
966		12		156
957		13		159
951		14		166
939		15		169
934		16		171
916		18		187
915		19		190
897		20		192
883		22		196
878		23		201
865		24		204
859		25		205
850		26		207
847		27		209
834		28		210
828		29		212
817		30		217
809		31		219
798		32		221
790		33		222
780		34		224
779		35		227
761		36		229
760		37		231
753		38		232
744		39		234

Optimization completed
----------------------
number of nodes     : 19
number of edges     : 48
number of demands   : 342
first solution time : 3
optimization time   : 180756
initial max maxLinkLoad    : 1072
final max maxLinkLoad      : 744
number of tunnels   : 39
pre-optimization max link utilization 1.072746118959375
post-optimization max link utilization 0.745310840725
5 demands over 342 (1.4619883040935673%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.770662
