
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1123		1		95
1114		2		122
1102		3		131
1093		4		139
1088		5		145
1078		6		150
1073		7		161
1068		8		166
1067		10		1288
1064		11		12610
1063		12		14615
1062		14		16620
1060		14		16624
1055		15		32660

Optimization completed
----------------------
number of nodes     : 23
number of edges     : 62
number of demands   : 506
first solution time : 4
optimization time   : 180108
initial max maxLinkLoad    : 1143
final max maxLinkLoad      : 1055
number of tunnels   : 15
pre-optimization max link utilization 1.1434846691355556
post-optimization max link utilization 1.055593042133333

Optimization time (in seconds): 180.126717756
