
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1153		1		91
1134		2		101
1126		3		106
1113		4		114
1112		5		119
1092		6		124
1091		7		128
1072		8		132
1070		9		135
1060		10		138
1052		11		157
1051		12		161
1043		13		4713
1042		15		177208
1041		16		177214
1035		15		177219
1034		16		178229

Optimization completed
----------------------
number of nodes     : 23
number of edges     : 62
number of demands   : 506
first solution time : 3
optimization time   : 180235
initial max maxLinkLoad    : 1173
final max maxLinkLoad      : 1034
number of tunnels   : 16
pre-optimization max link utilization 1.1735581000688888
post-optimization max link utilization 1.0347235354355557
1 demands over 506 (0.1976284584980237%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.25272241
