
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1129		1		96
1126		2		105
1115		3		109
1105		4		112
1094		5		115
1086		6		120
1081		7		125
1065		8		131
1062		9		134
1048		10		141
1044		10		152
1043		11		8353
1037		12		8355
1030		13		13362
1029		15		23395
1027		15		64509
1019		16		64515

Optimization completed
----------------------
number of nodes     : 23
number of edges     : 62
number of demands   : 506
first solution time : 3
optimization time   : 180891
initial max maxLinkLoad    : 1135
final max maxLinkLoad      : 1019
number of tunnels   : 16
pre-optimization max link utilization 1.1355714513600002
post-optimization max link utilization 1.0198534618388888
1 demands over 506 (0.1976284584980237%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.908926916
