              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1193		1		102
1190		2		120
1169		3		129
1148		4		133
1147		5		137
1126		6		140
1117		7		144
1097		8		146
1083		9		149
1075		10		153
1063		11		169
1041		11		177
1030		12		180
1019		13		183
1007		14		185
998		15		188
997		16		211
986		17		238
976		18		261
975		19		263
974		19		269
971		20		270
962		21		281
953		22		283
943		24		289
938		25		291
932		26		293
931		26		295
924		27		412
923		27		433
922		29		1556
921		29		1558
920		31		3796
918		28		3798
917		29		4892
914		33		8808
913		35		8827
911		36		8829
908		37		21112
906		41		22420
905		45		22422
903		46		23425
902		46		26436
901		49		26442
898		46		26445
897		52		28553

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 50
number of demands   : 306
first solution time : 2
optimization time   : 180655
initial max maxLinkLoad    : 1202
final max maxLinkLoad      : 897
number of tunnels   : 52
pre-optimization max link utilization 1.2029020286857142
post-optimization max link utilization 0.8976381801
8 demands over 306 (2.6143790849673203%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.671715935