
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1204		1		68
1184		2		74
1179		4		82
1157		5		86
1139		5		90
1136		6		93
1118		7		96
1102		8		98
1097		8		99
1095		7		101
1085		8		105
1077		9		107
1076		10		109
1075		11		111
1066		12		112
1043		13		114
1034		14		115
1025		15		118
1024		16		120
1013		17		122
1004		18		127
993		19		129
982		20		131
979		21		132
967		22		134
962		23		135
959		24		137
956		26		139
942		27		141
941		31		709
939		32		722
938		32		723
936		33		738
935		37		907
933		42		6116
932		44		7119
930		43		21779
929		46		120945
928		52		120948
926		54		120950
925		58		120953
924		58		120955
923		56		120957
922		54		120958
921		55		120960
920		56		132976
919		57		150996
918		53		178030

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 50
number of demands   : 306
first solution time : 2
optimization time   : 180033
initial max maxLinkLoad    : 1214
final max maxLinkLoad      : 918
number of tunnels   : 53
pre-optimization max link utilization 1.2150349909500002
post-optimization max link utilization 0.9188647342071428
4 demands over 306 (1.3071895424836601%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.042848279
