
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1149		1		84
1137		2		95
1121		3		101
1119		4		108
1106		5		111
1105		6		115
1089		7		119
1077		8		123
1061		9		136
1048		10		141
1032		11		144
1004		13		149
1001		14		152
995		15		154
989		14		156
986		15		166
985		15		1603
984		15		18172

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 44
number of demands   : 306
first solution time : 2
optimization time   : 180494
initial max maxLinkLoad    : 1179
final max maxLinkLoad      : 984
number of tunnels   : 15
pre-optimization max link utilization 1.17974913411
post-optimization max link utilization 0.9850847439
1 demands over 306 (0.32679738562091504%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.507373472
