
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1167		1		100
1137		2		118
1111		3		132
1107		4		137
1097		5		143
1077		6		150
1065		7		156
1050		8		159
1034		9		163
1019		10		166
1002		11		169
987		12		172
985		15		611

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 44
number of demands   : 306
first solution time : 5
optimization time   : 180040
initial max maxLinkLoad    : 1198
final max maxLinkLoad      : 985
number of tunnels   : 18
pre-optimization max link utilization 1.1991154295
post-optimization max link utilization 0.9859493333799999
1 demands over 306 (0.32679738562091504%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.059623733
