              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1132		1		81
1101		2		88
1092		3		93
1070		4		97
1062		5		104
1054		6		108
1041		7		110
1027		8		113
1015		9		115
1001		10		118
986		11		121
985		13		179
984		14		482

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 44
number of demands   : 306
first solution time : 3
optimization time   : 180814
initial max maxLinkLoad    : 1163
final max maxLinkLoad      : 984
number of tunnels   : 18
pre-optimization max link utilization 1.1639251761699998
post-optimization max link utilization 0.9852959212700001
2 demands over 306 (0.6535947712418301%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.83394893