              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1123		1		101
1104		2		109
1093		3		114
1089		4		118
1065		5		124
1058		6		130
1050		7		134
1027		8		137
1019		9		145
1003		10		155
996		11		158
989		12		186
987		15		298
986		16		315
984		16		6675

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 44
number of demands   : 306
first solution time : 6
optimization time   : 180014
initial max maxLinkLoad    : 1134
final max maxLinkLoad      : 984
number of tunnels   : 16
pre-optimization max link utilization 1.1350878104400002
post-optimization max link utilization 0.98518353187
1 demands over 306 (0.32679738562091504%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.033016112