
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1158		1		95
1144		2		102
1128		3		112
1127		4		120
1098		5		129
1096		6		136
1068		7		139
1066		8		142
1055		9		149
1036		10		152
1025		11		154
1004		12		157
999		13		160
998		15		2294

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 44
number of demands   : 306
first solution time : 6
optimization time   : 180653
initial max maxLinkLoad    : 1174
final max maxLinkLoad      : 998
number of tunnels   : 15
pre-optimization max link utilization 1.1751289141349999
post-optimization max link utilization 0.9991153622999999
1 demands over 306 (0.32679738562091504%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.674345479
