              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1133		1		60
1129		2		66
1113		3		71
1102		4		74
1082		5		77
1074		6		80
1052		7		82
1047		8		85
1038		9		87
1016		10		91
1007		11		95
994		12		97
993		13		100
991		14		420
990		14		422
988		16		2527
987		16		8532
986		16		10534

Optimization completed
----------------------
number of nodes     : 18
number of edges     : 44
number of demands   : 306
first solution time : 2
optimization time   : 180711
initial max maxLinkLoad    : 1143
final max maxLinkLoad      : 986
number of tunnels   : 16
pre-optimization max link utilization 1.14369138358
post-optimization max link utilization 0.98726045751
2 demands over 306 (0.6535947712418301%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.721710356