              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
599		1		95
597		2		107
593		3		113
581		4		121
578		5		131
568		6		137
567		8		3968
564		9		3970
562		10		3973
561		11		3974
558		12		3976
557		13		3977
556		14		3978
555		14		63433

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 3
optimization time   : 180600
initial max maxLinkLoad    : 612
final max maxLinkLoad      : 555
number of tunnels   : 15
pre-optimization max link utilization 0.61245547446
post-optimization max link utilization 0.55540153818
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.61655438