
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
662		1		122
641		2		138
639		3		144
629		4		176
616		5		183
614		6		208
613		7		216
610		8		239
597		9		262
587		10		278
586		11		313
582		12		327
579		13		337
577		14		349
573		15		352
572		16		364
567		16		367
558		17		369
556		18		372
554		19		374
552		21		1467
550		22		1469
549		24		9578
548		25		9580
547		25		9582
545		26		9584
543		31		9668

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 3
optimization time   : 180301
initial max maxLinkLoad    : 690
final max maxLinkLoad      : 543
number of tunnels   : 31
pre-optimization max link utilization 0.690906690505
post-optimization max link utilization 0.54346382
4 demands over 380 (1.0526315789473684%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.313427035
