
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
591		1		95
589		2		114
584		3		118
581		4		129
576		5		134
567		6		140
561		8		153
554		9		158
553		10		162
547		12		193
544		13		218
541		14		223
539		18		2671
538		16		158954
535		17		158960
533		18		174990
531		19		174994

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 4
optimization time   : 181001
initial max maxLinkLoad    : 609
final max maxLinkLoad      : 531
number of tunnels   : 19
pre-optimization max link utilization 0.60945815915
post-optimization max link utilization 0.5319406960499999
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 181.018523143
