
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
637		1		112
620		2		119
605		3		135
594		5		161
591		6		169
585		7		174
580		8		177
574		8		183
571		9		197
568		10		206
564		11		214
559		12		222
558		13		228
555		14		231
549		15		273
547		16		281
545		17		293
544		18		300
543		19		302
542		21		48434

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 3
optimization time   : 180688
initial max maxLinkLoad    : 668
final max maxLinkLoad      : 542
number of tunnels   : 22
pre-optimization max link utilization 0.6683388009950001
post-optimization max link utilization 0.5427571969449999
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.710624085
