              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
604		1		102
596		2		117
590		3		123
589		4		132
583		5		136
580		6		143
578		7		155
569		9		161
559		10		172
558		11		178
555		12		181
554		13		192
547		14		195
544		16		209
534		18		217
532		20		238
528		21		242
527		22		83078
525		24		83120
523		25		83125
522		30		94146
519		32		94172
518		34		94176

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 3
optimization time   : 180348
initial max maxLinkLoad    : 608
final max maxLinkLoad      : 518
number of tunnels   : 41
pre-optimization max link utilization 0.609124378375
post-optimization max link utilization 0.5187280476566666
5 demands over 380 (1.3157894736842106%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.367098905