
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
589		1		124
587		2		134
575		3		147
573		4		152
565		5		157
557		6		167
554		7		170
550		8		174
549		9		177
548		10		180
547		11		185
544		12		195
542		13		200
541		14		211
540		15		222
533		17		228
532		18		231
530		17		234
529		17		237
521		18		239
519		19		241
516		21		265
515		24		6812
514		25		6815
513		26		6816
511		28		6819
510		30		6823
508		31		6824
505		32		6826
504		34		6835
503		35		6909
501		36		7347
500		40		7353
499		40		7378

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 3
optimization time   : 180588
initial max maxLinkLoad    : 614
final max maxLinkLoad      : 499
number of tunnels   : 43
pre-optimization max link utilization 0.614796558755
post-optimization max link utilization 0.49933566396
2 demands over 380 (0.5263157894736842%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.602067409
