
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
600		1		67
574		2		79
571		4		86
569		5		90
564		6		94
554		7		97
553		8		99
545		9		101
543		10		105
542		11		107
541		12		109
535		13		111
532		14		114
528		15		123
526		16		128
525		17		131
523		18		133
519		19		135
514		20		138
512		21		140
511		26		1885
510		27		51355
509		28		60371
508		32		70397
507		37		80427
506		33		90463
505		34		90466
503		34		90469
502		34		137520
501		35		137523
500		36		142531
499		41		142534
498		43		142540

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 2
optimization time   : 180579
initial max maxLinkLoad    : 626
final max maxLinkLoad      : 498
number of tunnels   : 43
pre-optimization max link utilization 0.6268160566150001
post-optimization max link utilization 0.49829120211
5 demands over 380 (1.3157894736842106%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.589115789
