
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
620		1		102
606		2		113
596		4		129
589		4		141
585		5		145
581		6		159
576		7		167
569		9		172
559		10		174
557		10		178
555		12		201
554		13		215
552		13		223
549		14		231
546		14		239
545		15		241
543		16		464
542		17		466
541		18		476
539		19		482
538		21		486
535		22		496
534		26		44970
533		27		44976
532		26		44979
531		27		51992
530		27		51998
529		32		53024
526		36		60042
525		37		60045
524		38		60047
523		36		60049
522		36		60052
521		35		60058
520		37		60065
517		36		60069

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 62
number of demands   : 380
first solution time : 2
optimization time   : 180242
initial max maxLinkLoad    : 635
final max maxLinkLoad      : 517
number of tunnels   : 36
pre-optimization max link utilization 0.636145886115
post-optimization max link utilization 0.51756694046
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.256420608
