
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1081		1		79
1079		2		88
1043		3		93
1040		4		100
1021		5		106
1008		6		115
981		7		118
969		8		121
943		9		124
933		10		126
913		11		130
900		12		132
875		13		135
870		14		141
839		15		143
834		16		146
814		17		149
803		18		152
799		19		203
794		20		205
784		20		211
773		20		217
772		21		1221
771		23		3370

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 2
optimization time   : 180561
initial max maxLinkLoad    : 1116
final max maxLinkLoad      : 771
number of tunnels   : 24
pre-optimization max link utilization 1.116645454325
post-optimization max link utilization 0.7722818181750001
6 demands over 210 (2.857142857142857%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.577377916
