
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1075		1		82
1035		2		102
998		4		115
997		5		120
967		6		124
963		7		127
933		8		132
926		9		135
897		10		138
892		11		147
879		12		151
858		13		152
847		14		154
819		15		156
808		16		158
787		17		160
777		18		214
775		18		5519
774		20		92633

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 2
optimization time   : 180723
initial max maxLinkLoad    : 1105
final max maxLinkLoad      : 774
number of tunnels   : 20
pre-optimization max link utilization 1.1054698920375
post-optimization max link utilization 0.7748128518499999
2 demands over 210 (0.9523809523809523%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.737893959
