
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1108		1		92
1069		2		103
1049		3		112
1029		4		121
1013		5		125
991		6		129
977		7		133
954		8		138
942		9		141
922		10		144
885		12		152
883		13		154
854		14		163
849		15		166
817		16		172
816		17		174
809		18		179
793		18		181
788		20		4120
787		24		179165

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 2
optimization time   : 180167
initial max maxLinkLoad    : 1146
final max maxLinkLoad      : 787
number of tunnels   : 24
pre-optimization max link utilization 1.1467592715375001
post-optimization max link utilization 0.7882530358
2 demands over 210 (0.9523809523809523%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.179885411
