
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1086		1		85
1050		2		95
1047		3		101
1033		4		109
1014		5		112
998		6		115
977		7		122
965		8		125
941		9		127
931		10		129
923		11		131
893		12		132
888		13		135
874		14		136
851		15		138
837		16		140
813		17		142
802		18		143
780		19		145
774		20		146
767		21		155
759		20		180
755		22		2358

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 1
optimization time   : 180505
initial max maxLinkLoad    : 1121
final max maxLinkLoad      : 755
number of tunnels   : 22
pre-optimization max link utilization 1.1222022993625
post-optimization max link utilization 0.7563167815125
1 demands over 210 (0.47619047619047616%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.515765869
