
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1069		1		102
1065		2		120
1031		3		138
1029		4		143
995		5		147
990		6		153
956		7		157
951		8		161
933		9		164
920		10		166
899		11		171
880		12		173
869		13		175
846		14		177
841		15		180
811		16		185
801		17		188
774		18		191
763		19		193
760		20		194
757		20		260
755		21		290
752		23		1402
751		22		61807
750		23		66814
749		24		72835

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 11
optimization time   : 180954
initial max maxLinkLoad    : 1100
final max maxLinkLoad      : 749
number of tunnels   : 24
pre-optimization max link utilization 1.1007277593
post-optimization max link utilization 0.7502600734875
5 demands over 210 (2.380952380952381%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.982346257
