
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1070		1		95
1054		2		102
1030		3		134
1015		4		138
992		5		143
975		6		151
954		7		157
937		8		160
914		9		166
906		10		168
883		11		173
875		12		175
851		13		180
846		14		182
820		15		186
815		15		195
808		16		198
800		17		200
778		18		202
777		20		4713
776		20		4716
775		22		10015
772		23		54064

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 4
optimization time   : 180197
initial max maxLinkLoad    : 1094
final max maxLinkLoad      : 772
number of tunnels   : 23
pre-optimization max link utilization 1.094599189575
post-optimization max link utilization 0.773142279275
2 demands over 210 (0.9523809523809523%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.213256963
