
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1107		1		111
1071		2		123
1041		3		132
1033		4		140
1021		5		156
997		6		160
985		7		179
964		8		182
952		9		184
933		10		187
932		11		190
900		12		192
894		13		194
868		14		196
863		15		198
835		16		200
827		17		202
802		18		203
788		19		208
785		20		211
784		19		278
783		21		284
779		23		3992
777		23		10000

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 2
optimization time   : 180181
initial max maxLinkLoad    : 1140
final max maxLinkLoad      : 777
number of tunnels   : 23
pre-optimization max link utilization 1.1410406515
post-optimization max link utilization 0.7775069237625
5 demands over 210 (2.380952380952381%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.2078455
