
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1108		1		87
1082		2		100
1069		3		112
1043		4		121
1030		5		124
1011		6		129
1005		7		132
972		8		135
970		9		137
933		10		140
931		11		143
899		12		145
897		13		148
864		14		155
859		15		157
846		16		161
830		17		164
821		18		166
801		19		168
784		20		171
783		21		173
770		20		198
768		22		1897

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 3
optimization time   : 180122
initial max maxLinkLoad    : 1143
final max maxLinkLoad      : 768
number of tunnels   : 22
pre-optimization max link utilization 1.143884351975
post-optimization max link utilization 0.7691454259749999
7 demands over 210 (3.3333333333333335%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.135427719
