
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1088		1		102
1083		2		112
1056		3		118
1045		4		122
1029		5		125
1023		6		129
997		7		134
986		8		140
961		9		144
955		10		148
930		11		154
917		12		156
893		13		160
883		14		162
860		15		164
844		16		167
822		17		169
804		18		171
783		19		173
781		20		175
771		21		178
768		22		197
758		23		200
757		23		4367
756		25		5427

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 1
optimization time   : 180545
initial max maxLinkLoad    : 1122
final max maxLinkLoad      : 756
number of tunnels   : 25
pre-optimization max link utilization 1.122990663025
post-optimization max link utilization 0.756665558025
8 demands over 210 (3.8095238095238093%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.558210994
