
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1056		1		89
1020		2		102
1011		3		107
983		4		115
977		5		119
946		6		121
944		7		125
910		8		128
906		9		131
876		10		134
867		11		136
839		12		139
836		13		156
808		14		159
805		15		161
780		16		172
777		18		388
776		18		47522

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 2
optimization time   : 180666
initial max maxLinkLoad    : 1095
final max maxLinkLoad      : 776
number of tunnels   : 18
pre-optimization max link utilization 1.0957067894375
post-optimization max link utilization 0.77727227965
1 demands over 210 (0.47619047619047616%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.676402898
