              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1092		1		85
1072		2		95
1059		3		104
1032		4		113
1020		5		117
1014		6		121
984		7		125
980		8		130
950		9		133
944		10		139
927		11		141
911		12		151
895		13		154
888		14		156
860		15		158
852		16		160
830		17		162
812		18		163
800		19		165
776		20		167
773		21		169
766		22		171
760		24		2587
759		24		38689

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 4
optimization time   : 180476
initial max maxLinkLoad    : 1129
final max maxLinkLoad      : 759
number of tunnels   : 25
pre-optimization max link utilization 1.1301155505625
post-optimization max link utilization 0.7601734377625
7 demands over 210 (3.3333333333333335%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.502558498