
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1103		1		85
1100		2		103
1064		3		107
1062		4		111
1029		5		114
1026		6		117
1010		7		121
988		8		128
977		9		132
950		10		137
940		11		140
913		12		146
902		13		149
880		14		154
870		15		160
841		16		162
831		17		172
809		18		174
793		19		179
792		20		181
788		21		285
786		22		318
782		21		323
780		23		672
775		23		748

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 10
optimization time   : 180201
initial max maxLinkLoad    : 1119
final max maxLinkLoad      : 775
number of tunnels   : 23
pre-optimization max link utilization 1.1197524709250002
post-optimization max link utilization 0.7758129421875001
7 demands over 210 (3.3333333333333335%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.219523742
