
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1100		1		85
1092		2		103
1074		3		114
1064		4		118
1040		5		126
1024		6		154
1001		7		161
991		8		167
985		9		170
952		10		172
949		11		194
914		12		198
912		13		200
878		14		202
874		15		208
839		16		219
838		17		224
808		18		266
803		19		268
770		20		278
767		21		414
765		24		47435
764		24		66456

Optimization completed
----------------------
number of nodes     : 15
number of edges     : 36
number of demands   : 210
first solution time : 2
optimization time   : 180573
initial max maxLinkLoad    : 1136
final max maxLinkLoad      : 764
number of tunnels   : 24
pre-optimization max link utilization 1.1368676523874999
post-optimization max link utilization 0.7653307938874999
7 demands over 210 (3.3333333333333335%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.589550084
