
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1107		1		76
1061		2		85
1059		3		89
1003		4		103
1000		5		109
970		7		116
966		8		118
953		9		121
947		10		122
941		11		124
938		12		126
932		13		128
921		14		130
912		15		132
910		16		135
903		17		137
891		18		140
889		19		143
884		20		145
875		21		147
863		22		149
858		23		150
836		24		152
833		25		155
831		27		162
828		27		164
827		28		165
825		28		175
821		29		180
801		30		182
791		31		186
786		31		187
782		32		190
779		31		218
768		32		220
765		33		381
758		34		384
752		34		385
751		33		11969
747		35		11970
740		41		12186
739		39		22502

Optimization completed
----------------------
number of nodes     : 14
number of edges     : 34
number of demands   : 182
first solution time : 2
optimization time   : 180537
initial max maxLinkLoad    : 1109
final max maxLinkLoad      : 739
number of tunnels   : 38
pre-optimization max link utilization 1.1096257922
post-optimization max link utilization 0.74030001612
4 demands over 182 (2.197802197802198%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.546021725
