
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1079		1		93
1065		2		103
1045		3		110
1033		4		114
1012		5		120
1011		6		2232
1009		9		2950
1007		12		3216
1003		15		3663
1000		15		4801
999		13		5623

Optimization completed
----------------------
number of nodes     : 23
number of edges     : 50
number of demands   : 506
first solution time : 3
optimization time   : 180990
initial max maxLinkLoad    : 1095
final max maxLinkLoad      : 999
number of tunnels   : 13
pre-optimization max link utilization 1.0960997716
post-optimization max link utilization 0.9999396407777776
1 demands over 506 (0.1976284584980237%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 181.007704525
