
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1100		1		85
1092		2		94
1066		3		100
1061		4		107
1046		5		113
1042		8		6389
1041		9		6869
1040		11		7632
1036		8		7861
1035		14		10478
1034		13		16084
1033		14		72884

Optimization completed
----------------------
number of nodes     : 23
number of edges     : 50
number of demands   : 506
first solution time : 2
optimization time   : 180112
initial max maxLinkLoad    : 1132
final max maxLinkLoad      : 1033
number of tunnels   : 14
pre-optimization max link utilization 1.132802883488889
post-optimization max link utilization 1.0342104241333332
1 demands over 506 (0.1976284584980237%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.125630758
