
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1085		1		159
1061		2		181
1052		4		201
1051		5		210
1027		6		222
1026		7		227
1020		8		231
1018		9		61191
1015		10		61194

Optimization completed
----------------------
number of nodes     : 22
number of edges     : 48
number of demands   : 462
first solution time : 3
optimization time   : 180443
initial max maxLinkLoad    : 1094
final max maxLinkLoad      : 1015
number of tunnels   : 10
pre-optimization max link utilization 1.0945913181777778
post-optimization max link utilization 1.016368551622222
1 demands over 462 (0.21645021645021645%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.460584876
