
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1058		1		89
1057		2		98
1053		3		103
1036		4		108
1025		5		112
1023		6		117
1018		7		121
1004		8		124
999		9		87324

Optimization completed
----------------------
number of nodes     : 22
number of edges     : 48
number of demands   : 462
first solution time : 4
optimization time   : 180522
initial max maxLinkLoad    : 1065
final max maxLinkLoad      : 999
number of tunnels   : 9
pre-optimization max link utilization 1.0663455576444445
post-optimization max link utilization 1.0000112269333334
1 demands over 462 (0.21645021645021645%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.537386103
